Sign In | Join Free | My benadorassociates.com
China Hebei Shengtian Pipe Fittings Group Co., Ltd. logo
Hebei Shengtian Pipe Fittings Group Co., Ltd.
Hebei Shengtian Pipe Fittings Group Co.,Ltd. Base on China,Service the world
Site Member

5 Years

Home > Carbon Steel Pipe Cap >

Butt Welding Sch40 ASME B16.9 A234 Carbon Steel Cap

Hebei Shengtian Pipe Fittings Group Co., Ltd.
Contact Now

Butt Welding Sch40 ASME B16.9 A234 Carbon Steel Cap

  • 1
  • 2

Brand Name : Shengtian

Model Number : Cap 008

Certification : TUV/SGS

Place of Origin : Cangzhou,Hebei,China

MOQ : 10 Pieces

Price : 10-99 PiecesUS $4.68/piece   100-199 PiecesUS $4.24/piece   200+ PiecesUS $3.54/piece

Payment Terms : L/C, D/A, D/P, T/T, Western Union, MoneyGram

Supply Ability : 50tons/Month

Delivery Time : 10-15 work days

Packaging Details : Packaged on The Pallets

Thickness : Sch 80

Connection : Butt Welding

Certificate : ISO9001:2000

Inspection : Factory In-House Check or The Third Party Inspection

Wall Thickness : SCH5-SCH160 XS XXS STD

Size : DN15-DN1600

Head Code : Round

Shape : Reducing

Contact Now

  Sch40 ASME B16.9 A234 Carbon Steel Pipe Cap

Cap
Type cap, enc cap, pipe cap, seamless cap , butt welding cap, carbon steel cap(CS cap),
mild steel cap(MS cap), alloy steel cap(AS cap), stainless steel cap(SS cap)
Size 1/2"-48"(DN15-DN1200)
Varieties SCH5,SCH10,SCH20,SCH30,STD,SGP, SCH40, SCH60,
XS, SCH80, XXS,SCH100,SCH120,SCH140,SCH160
Standard ANSI/ASTM/ASME B16.9/16.28, API 5L, DIN2617, JIS B2311/2312/2313
Material Carbon steel: ASTM A234 GR WPB , ST37.2 , ST35.8...
Alloy steel: A234 WP5/WP9/WP11/WP22/WP91, A420 WPL6,
A860 WHPY 42/52/60/65/70/80...
Stainless steel: A403 WP304/TP304 , WP304L/TP304L , WP316/TP316 ,WP316L/TP316L, WP321/TP321 , WP310/TP310…..
Surface treatment Carbon steel:Shot blasted, black painting, rust-proof oil, transparent oil,
galvanizing,hot galvanizing
Alloy steel:Shot blasted, black painting, rust-proof oil,
transparent oil, galvanizing,hot galvanizing
Stainless steel: pickled,Polish
Application Fields Chemical Industry /Petroleum Industry /Power Industry/Metallurgical Industry
Building Industry /Ship-building Industry
Packing plywood cases, pallets, nylon bags or according to the customers' requirements

  FAQ:

  1. Are you a factory or trading company?

  We are a factory.we also have cooperated factory doing other steel business.

  2. How can I get a quotation from you ?

  You can leave us message, and we will reply every message in time. Or we may talk on line by Trademanager.

  And you can also find our contact information on contact page.

  3.Can I get samples before order ?

  Yes, of course. Usually our samples are free. we can produce by your samples or technical drawings.

  4. what is your delivery time ?

  The time of delivery is usually around 20 days(1*20FT as usual).

  We can send out in 2 days, if it has stock.

  5.What is your payment terms?

  Our usual payment term is 30% deposite, and rest against B/L. L/C is also acceptatble.EXW,FOB,CFR,CIF,DDU.

  6.How does your factory do regarding quality control?

  Quality is priority. Our factory has gained ISO9001 authentication. We guarantee the goods out from our factory 100% qualified.

  And Each Process, we have very strict operation and arrange 2 techinians to inspect. After the products are finished,

  we will make the last test to pick up the unqualified products

  7.What is your MOQ?

  As long as hold one container ,we can accpet the order.

  Product details:

Butt Welding Sch40 ASME B16.9 A234 Carbon Steel Cap


Product Tags:

A234 Carbon Steel Cap

      

ASME B16.9 Carbon Steel Cap

      

Sch40 Carbon Steel Cap

      
Quality Butt Welding Sch40 ASME B16.9 A234 Carbon Steel Cap for sale

Butt Welding Sch40 ASME B16.9 A234 Carbon Steel Cap Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Hebei Shengtian Pipe Fittings Group Co., Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)